This week, the CO2 pump for the CEEGS facility was delivered to HZDR. The CO2 pump is the main component for pressurising the CEEGS test facility. It draws in liquid CO2 from a storage tank and can pressurise it to over 200 bar. This will allow us to conduct high-pressure experiments in the future. The pump will be connected to the CO2 test facility and commissioned in April and May.